Stage 2 roof raise

Week 5 of 2023

More welding;

We fixed the door frame on the driver’s side on the bus and lengthened the door. Hopefully it all fits when we put the door back in place. The wrong sealant was used when we put the gasket back so we may have to redo the gasket later if it proves not to be watertight.

Next, we cut back the fiberglass on top roof at the very front of the bus. Talking about a major fiber glass dust cloud! Can’t be too healthy but it was the only way to get our front transition into place. We cut back about 2 inches so we can lay the transition steel on top of it and tie it all together.

Then it was time to weld the longitudinal transition supports in place. We managed to get three of them in.

Unfortunately, because of some welding drops, we damaged the steering wheel and window washer/blinker in the process. Sigh.

 Next we can start skinning! Although lifting up the AC would have been nice, we have no solution for it yet so we will have to change the order of events to make sure we don’t lose too much time