Categories
Stage 2 roof raise

Week 7 of 2023

Skinning Continued

This week we continued skinning the bus. Since it is a two person job, we can only do this when we are both available at the same time. Saturday afternoon after archery and Sunday afternoon after church it is!.

First sheet going on the back of the driver’s side

Definitely a marriage builder….

As of now, we have the sheets on both sides of the bus in place. It makes it look so much better on both the inside and the outside!

Need more steel

It looks like we are slightly short of plate so we will have to get another sheet. We skinned a few of the window openings as well; one on each side of the future bedroom and one where the shower is going to be. That will leave space to install a fan so we keep the humidity out of the bus when we clean ourselves up.

We finished the door frame of the little door. Whenever we have a small sheet available we will put the extended door in place.

We welded two more bars inside of the bus to attach the top of the sheets that are covering the disability door. It all looks nicely closed up now